Our facility will be ready for launch in a second week of October 2022. For booking stay we will provide you with booking system. System will be available when our facility will be ready to take first guests.

Prison facility

location

Our facility is located in Warsaw, a bit north of Old Town, near Wisla river. It is a decent location! 30 mins by foot to the Old Town, 10 mins by taxi to the city center, around 20 mins by taxi to Chopin airport.

The building is 650 m2, a 2-floor office building with 2 wings on each floor and a central section with a staircase.

Here is our building floor plan.

First floor:


Second floor:

Rooms

Movie / Event Space

Those are biggest open spaces in our studio. We can use them for making movies . Space can be freely equipped with furnitures. For events. Perfect for shibari workshops , private parties or just a 'parade ground' during prison events.
Movie/event space A in progressshow progress list
The biggest room in WP . Mainly used as event and movie making space. Because of its size can be used as 'a parade ground' during prison events. Equipped with heavy steel frame construction 'gantry' - specially useful during Shibari workshops and events.
  • Removing old floors done
  • Fixing base floor done
  • Construction of steel construction underlay for plaster walls done
  • Construction of plasterboard walls done
  • Moving wall sockets done
  • Ceiling painting waiting
  • Red brick laying in progress
  • Adding windows shutters waiting
  • Putting new floor waiting
  • Installing new lighting waiting
  • Installing gantry waiting
Movie/event space B in progressshow progress list
The second biggest room in WP . Same as Movie Space A mostly used for filming. During events can be equipped with sofas as a lounge room Also equipped with the gantry.
  • Removing old floor done
  • Fixing base floor done
  • Construction of steel construction underlay for plaster walls done
  • Construction of plasterboard walls in progress
  • Moving wall sockets in progress
  • Ceiling painting waiting
  • Laying concrete wall tiles waiting
  • Putting new floor waiting
  • Adding window shutters waiting
  • Installing new lighting waiting
  • Installing gantry waiting

Guestrooms block

Each room is around 30 sqm - 24 sqm + 6 sqm bathroom. Each room equipment will include fourposter bed, vertical bondage frame, suspension bondage frame and spanking bench. Also there will be a plenty of restraints - leather cuffs, chains, police cuffs.
Room no. 1 in progressshow progress list
The first room to the right.
  • Removing old floor done
  • Removing old plasterwalls done
  • Construction of steel construction underlay for plaster walls done
  • Puting sewage pipes done
  • Construction of plasterboard walls in progress
  • Moving wall sockets in progress
  • Doing wall tiles in bathroom in progress
  • Doing floor tiles in bathroom done
  • Adding window shutters waiting
  • Installing shower waiting
  • Installing toilet sink waiting
  • Installing basin waiting
  • Installing bathroom doors waiting
  • Putting new floor waiting
  • Painting walls and ceiling waiting
  • Installing new lighting waiting
  • Adding Four poster bed waiting
  • Adding spanking bench waiting
  • Adding mini suspension frame waiting
Room no. 2 in progressshow progress list
The first room to the left.
  • Removing old floor done
  • Removing old plasterwalls done
  • Fixing floor done
  • Puting sewage pipes done
  • Construction of steel construction underlay for plaster walls done
  • Construction of plasterboard walls in progress
  • Moving wall sockets in progress
  • Doing wall tiles in bathroom waiting
  • Doing floor tiles in bathroom done
  • Installing shower waiting
  • Installing toilet sink waiting
  • Installing basin waiting
  • Installing bathroom doors waiting
  • Putting new floor waiting
  • Painting walls and ceiling waiting
  • Installing new lighting waiting
  • Adding Four poster bed waiting
  • Adding spanking bench waiting
  • Adding gear rack waiting
  • Adding mini suspension frame waiting
Room no. 3 in progressshow progress list
The second room to the right.
  • Removing old floor done
  • Removing old plasterwalls done
  • Construction of steel construction underlay for plaster walls done
  • Puting sewage pipes done
  • Construction of plasterboard walls in progress
  • Moving wall sockets in progress
  • Doing wall tiles in bathroom in progress
  • Doing floor tiles in bathroom in progress
  • Adding window shutters waiting
  • Installing shower waiting
  • Installing toilet sink waiting
  • Installing basin waiting
  • Installing bathroom doors waiting
  • Putting new floor waiting
  • Painting walls and ceiling waiting
  • Installing new lighting waiting
  • Adding Four poster bed waiting
  • Adding spanking bench waiting
  • Adding mini suspension frame waiting
Room no. 4 in progressshow progress list
The second room to the left.
  • Removing old floor done
  • Removing old plasterwalls done
  • Construction of steel construction underlay for plaster walls done
  • Puting sewage pipes done
  • Construction of plasterboard walls in progress
  • Moving wall sockets in progress
  • Doing wall tiles in bathroom in progress
  • Doing floor tiles in bathroom in progress
  • Adding window shutters waiting
  • Installing shower waiting
  • Installing toilet sink waiting
  • Installing basin waiting
  • Installing bathroom doors waiting
  • Putting new floor waiting
  • Painting walls and ceiling waiting
  • Installing new lighting waiting
  • Adding Four poster bed waiting
  • Adding St Andrews cross waiting
  • Adding mini suspension frame waiting

Prison block

Prison block is hear of our facility.
Prison block in progressshow progress list
The prison cells are located on the second floor, left-wing. There are 4 prison cells. Each 2 m width and 3 m depth. Entry doors are sliding-type doors, double doors. The first doors are solid type, with view port and food port . Second, are bar type.
  • Removing old seperations walls done
  • Construction of steel construction underlay for plaster walls done
  • Assembling plasterwalls in progress
  • Moving power sockets in progress
  • Installing water and sewage waiting
  • Putting new pvc floors waiting
  • Instaling prison cell door waiting
  • Installing window shutters waiting
  • Installing new lighting and power sockets waiting
  • Installing cell doors waiting
  • Installing sinks and toilets waiting
Shower room in progressshow progress list
    Warden's Office / Interogation room in progressshow progress list
      24/7 Cell in progressshow progress list

        Ground level block

        This part of building is sheduled to open in early 2023 . If we will be sucesfull with bookings it is possible to open Crude cells room in end Novmeber, beging of December 2022.
        Water tanks room waitingshow progress list
          Crude room with cells waitingshow progress list
            Clinic waitingshow progress list
              Stage room waitingshow progress list
                More than 4500+ session pictures!
                Helpless prisoners trained and punished by cruel Warden and her sexy Officers.
                click here

                WP 2.0

                650 sqm of space! The movie studio, BDSM dungeon, and event space in Warsaw. Decent location 30 min by foot from Old Town.

                Easy to reach

                Warsaw can be easily reached by plane. Less than 2 h from most European destinations. Flying from the USA and CA?
                You can easily get directly from Toronto, Chicago, New York, and Los Angeles in 8-12h for 500$ both ways!

                Warsaw City

                Warsaw is a beautiful, clean, and very safe city. The Old Town, Wisla river boulevard, Museums, gardens but also a modern city with great transport infrastructure, shopping halls, a lot of good quality hotels and restaurants with tasty food. Also some unique leisures - DeepSpot, FlySpot, Suntago Water Park, shooting ranges, tank driving, car tracks.