Warsaw Prison 2.0
Old website was moved to
Warsaw Prison by Lady Daria Archive
You can follow our progress on our
YouTube Channel
Updates
- [9-11-2022] - It is here. Warsaw Prison Release update - Studio A and B
- [9-11-2022] - More shoots in Studio A and B . Today more Femdom with Kinky mistress, 1 male slave, 1 famle slave. Updates on social media soon.
- [7-11-2022] - First shoots in WP 2.0 . Two high end mistresses, 2 female slaves 1 , male slave . More details soon on our social media.
- [2-11-2022] - New movie on our YT channel Studio A and B Pre Release update
Studio A and B Pre Release update.
- [28-10-2022] - Windows are covered
- [25-10-2022] - Most of furnitures are moved from storage in Steel Alive
- [21-10-2022] - Floors are ready both in Studio A and B
- [18-10-2022] - Studio A is also done with lighting
- [13-10-2022] - Lighting done in studio B
- [12-10-2022] - New movie on our YT channel Small update but big milestone. Small gear is in our storage !
- [7-10-2022] - Storage has floor, storage racks and covered windows.
- [6-10-2022] - Studio A is painted !
- [1-10-2022] - New movie on our YT channel Studio A - grouting done. Studio B - painted. Movie studio launch in 2 weeks !
- [1-10-2022] - Last call for shares. There are only 14 shares remaning !
456 / 470 shares ( 97% )
- [30-09-2022] - Power issue has been fixed. We can use our power tools ( and use toilet without flashlight )
- [29-09-2022] - Almost done with grouting of Studio A. It tooked almost 3 weeks to make it. A lot of work.
- [24-09-2022] - Hugo power issue. Excavator on nearby construction site broke our power cable.
- [23-09-2022] - Studio B is painted ! Only light and floor left to do.
- [15-09-2022] - We started on finishing touch in studio B - plastering, sanding walls and painting
- [8-09-2022] - New movie on our YT channel Red brick update! Almost done with Studio A and Studio B
- [1-09-2022] - Last call for shares. There are only 50 shares remaning !
420 / 470 shares ( 90% )
- [29-08-2022] - Huge step ! Red bricks are in Studio A
- [23-08-2022] - New movie on our YT channel Update. Toilets are almost ready. Studio A,B and Guestrooms in 70% .
- [19-08-2022] - Guestrooms bathrooms have hydroisolation done ! We started working with tiles.
- [16-08-2022] - We are done with tiling of 0 floor middle section toilets. Grouting, little plastering, painting left.
- [11-08-2022] - We are done with plasterboard frames in the right wing. We started working in left top one with cells, washroom, staff room
- [08-08-2022] - Huge delivery ! Almost 3 pallets full of tiles ( 2,5 tons )
- [04-08-2022] - We are done with tiling of 1 floor middle section toilets. Grouting, little plastering, painting left.
- [1-08-2022] - New movie on our YT channel Update. Progress is visible !
- [31-05-2022] - We have issued shares for 330 000 pln ! That means that are only 140 more shares left .
330 / 470 shares ( 70% )
- [25-07-2022] - Plasterwalls frame in studio A and B are ready. We start working on sewage and water pipes.
- [15-07-2022] - Second big purchase - 5 pallets of 2.6 x 1.2 plasterboard thats almost 8 000 kg . Plus 600 sqm of rockwool for wall isulations .
- [11-07-2022] - We bought first sink, toilet and showers footbath to plan brief bathrooms layout
- [06-07-2022] - First big purchase - 600 steel profiles for plasterwalls frames.
- [04-07-2022] - PreConstruction step has ended. Chogal posted movie on YT channel End of pre (de) construction works
- [22-06-2022] - Construction works have started!
- [22-06-2022] - Big day has come. Chogal finished all his jobs in his Steel Alive . Now he and his team is fully commited to work for WP 2.0 for next few months .
- [18-05-2022] - We have almost 200 000 pln on our bank account ! That means that are only 270 more shares left .
200 / 470 shares ( 42% )
- [12-05-2022] - We started issuing shares of WP 2.0 . Almost 200 000 pln indeclared shares ! WP 2.0 officaly starts now.
- [8-05-2022] - New movie on our YT channel Before moving the equipment from WP part 2
- [7-05-2022] - Some changes in our website
- [1-05-2022] - New movie on our YT channel Before moving the equipment from WP
- [19-04-2022] - You can check how our building looks like now on our Youtube Warsaw Prison
- [17-04-2022] - Chogal added small progress tracker
- [15-04-2022] - Company has been registred in court. We have our tax number !
- [12-04-2022] - New updated drawing for our new prison
- [07-04-2022] - Chogal has signed entity documents and send to registration court. We need 2-3 weeks to get an entry
- [06-04-2022] - We have selected our buidling. It is a decent location! We will post layout drawings later.